m belt conveyor bill of quantities
...
20m Belt Conveyor Bill Of Quantities
BILL OF QUANTITIES Nagpur Metro. BILL OF QUANTITIES ITEM NO. DESCRIPTION QTY. UNIT Estimated Rates Estimated Amount A FIELD WORK 1 Vertical Boring 150mm dia. through all kinds of soils and weathered/soft rock with adequate / suitable equipment for depths measured below existing ground level including mobilization, setting up boring rig, demobilization the same (CR. =20%).
Ask for price
Belt Conveyors for Bulk Materials Practical Calculations
BELT CONVEYORS FOR BULK MATERIALS 1. INTRODUCTION: Belt conveyors consist of two powered pulleys with a continuous loop of belting material used to convey products. Belt conveyors are the most economical powered conveyor and are typically used for conveying products over long distances, at high speeds, or for incline/decline applications.
Ask for price
Bulk Material Belt Conveyor Specification
Bulk Material Belt Conveyor Specification John Andrew P.E. Course Content Belt Conveyors Belt conveyors range in length from a few feet to several miles. They carry everything from small packages to thousands of tons of bulk material per hour. A belt conveyor can unload a
Ask for price
Bill of Quantity (BOQ) FOR Routine Maintenance Work
office of the director (maint) m-4 & m-4 (ext) summary of bill of quantities routine maintenance work (km 00 to km 52) bill no.6 ancillary works rmf-305-2017-18 code description unit rate (rs.) quantity amount (rs) 601ai rcc new jersy barrier (in-situ) for median double face (incl. reinforcement) m 11060.42 -601di
Ask for price
BILL OF QUANTITIES
Section IX: Bill of Quantities (BoQ) Page: 83 of 90 5.2 A/R Providing and constructing boulder barriers as directed by the Engineer Height 1.5 m m 120.00 Sub-total = SECTION 6: BIO-ENGINEERING WORKS 6.1 RW0233 Supply and live stacking m 500.00
Ask for price
Bill of Quantities (BoQ) Revised Version
Bill of Quantities (BoQ) Revised Version Rehabilitation of Agricultural Wells in the Jordan Valley A. Unit prices of all items shall include but not limited to cleaning the site from all surplus, backfill material, or result of excavation, repairing all damages
Ask for price
Billing of Quantities (BOQ) Types Example BOQ
Jul 04, 2019· Bill of Quantities also referred to as BOQ, is a document formulated in the construction industry to specify materials, labors, and their cost. It serves as a communication tool between client, consultant & the contractor. It is usually prepared by a cost consultant or a surveyor. Primarily there are two types of BOQs
Ask for price
BILL OF QUANTITIES
BILL OF QUANTITIES Table of Contents Part :1 a. Preamble to Bill of Quantities b. Preliminaries for the Work c. Construction Cost General Summary Bill No. 1 Building Works Bill No. 2 External Works Bill No. 3 Exhibition Works Bill No. 4 Furniture Works Part :2 d. Dayw ork Rate. VOLUME III PART: 1
Ask for price
BOQ FOR 1 Nos BOREHOLE (200-250M) BILL OF QUANTITIES
BILL OF QUANTITIES S. No. Description of work Quantity Unit 1. 5.70 1½"x1½x6m angle iron for ladder and support at the walkway 16.00 m 0.00 5.80 plumbing fittings and installations ( pipes, elbows, tees, taps and valves). And drain for run-off water 1.00 L/s 0.00
Ask for price
SECTION-7: BILL OF QUANTITIES
The Bill of Quantities shall be read in conjunction with the Instructions to Bidders, General and Particular Conditions, Technical Specifications, and Drawings. 2. The quantities given in the Bill of Quantities are estimated and provisional, and are given to provide a common basis for bidding. The basis of payment will be the actual
Ask for price
Bill of Quantity (BOQ) FOR Routine Maintenance Work
office of the director (maint) m-4 & m-4 (ext) summary of bill of quantities routine maintenance work (km 00 to km 52) bill no.6 ancillary works rmf-305-2017-18 code description unit rate (rs.) quantity amount (rs) 601ai rcc new jersy barrier (in-situ) for median double face (incl. reinforcement) m 11060.42 -601di
Ask for price
ATTCHMENT 3 BILL OF QUANTITIES
BILL OF QUANTITIES . m 210.00 39 Door angle bar 50x50x5mm m 6.50 40 Hinge pair 1.00 41 Valve unit 1.00 42 Metal lath with 40x40mm mesh m 2 452.00 43 Armature t 0.10 44 Oil pointing of columns (2 coats) m 2 44.000 2. Pipeline (Aqueduct) 1 Excavation of Class III grounds, side-dumping of the soil m
Ask for price
BILL OF QUANTITIES Kisumu
Bill No. 5 Earthworks 5.1Cut to spoil in soft. m3 3,540 5.2Cut to spoil in hard. m3 44 5.3Compact the surface in to receive approved fill or pavement material to the satisfaction of the Engineer. m2 17,680 5.4Provide, lay and compact approved fill material to formation levels in 150mm layers compacted to 100%MDD (AASHTO T99) as subgrade. m3 450
Ask for price
BILL OF QUANTITIES
BILL OF QUANTITIES Table of Contents Part :1 a. Preamble to Bill of Quantities b. Preliminaries for the Work c. Construction Cost General Summary Bill No. 1 Building Works Bill No. 2 External Works Bill No. 3 Exhibition Works Bill No. 4 Furniture Works Part :2 d. Dayw ork Rate. VOLUME III PART: 1
Ask for price
Billing of Quantities (BOQ) Types Example BOQ
Jul 04, 2019· Bill of Quantities also referred to as BOQ, is a document formulated in the construction industry to specify materials, labors, and their cost. It serves as a communication tool between client, consultant & the contractor. It is usually prepared by a cost consultant or a surveyor. Primarily there are two types of BOQs
Ask for price
BOQ FOR 1 Nos BOREHOLE (200-250M) BILL OF QUANTITIES
BILL OF QUANTITIES S. No. Description of work Quantity Unit 1. 5.70 1½"x1½x6m angle iron for ladder and support at the walkway 16.00 m 0.00 5.80 plumbing fittings and installations ( pipes, elbows, tees, taps and valves). And drain for run-off water 1.00 L/s 0.00
Ask for price
BILL OF QUANTITIES Department of Agriculture
Subject : BILL OF QUANTITIES QTY UNIT PARTICULARS UNIT COST MATERIAL COST LABOR COST AMOUNT 5.00 pcs Aluminum white finger puller 15.00 pcs Heavy duty concealed hinges 10.00 l.m. Pvc edging 1.00 lit Rugby 4.00 kg Assorted nails Wall Panel-2 4.00 pcs Wood laminate (light oak) 4ft x 8ft 4.00 pcs Marine plywood 1/2" x 4ft x 8ft 2.00 lit Rugby
Ask for price
BILL OF QUANTITIES FOR THE PROPOSED RENOVATION
33.00 m 7 Supply and Install 200x22mm softwood timber Fascia Board 135.00 m SAFETY & SECURITY Timber to roof trusses 1 150 x 50mm 135.00 m 2 100 x 50 mm 75.00 m 3 50 x 50mm 140.00 m IBR Roofing 4 Supply and fit 0.5mm IBR roofing sheets m115.00 2 5 Supply and fit G.I Ridges 10.00 m 6
Ask for price
SECTION-7: BILL OF QUANTITIES
The Bill of Quantities shall be read in conjunction with the Instructions to Bidders, General and Particular Conditions, Technical Specifications, and Drawings. 2. The quantities given in the Bill of Quantities are estimated and provisional, and are given to provide a common basis for bidding. The basis of payment will be the actual
Ask for price
What is a Bill of Quantities and its Use in Construction
May 24, 2019· A Bill of Quantities, as defined by the Business Dictionary, is an itemized list of materials, parts and labour with their costs, required to undertake construction work. It can also be defined as a document compiled for construction projects in which all elements of material, labour, profits and contractors overheads, plant and equipment
Ask for price
BILLS OF QUANTITIES
Shall be as specified in the Bills of Quantities or equal and approved. Prices must include for removing and refixing during and after painting, for labelling all keys, and for fixing with matching screws. METALWORK Structural Steelwork shall comply with M.O.W. "Structural Steelwork Specification" 1973.
Ask for price
Example Bill of Quantities CESMM4 Revised: Examples
Aug 10, 2020· All Subjects. Buildings and structures. Coastal and offshore engineering. Development, planning and urban engineering. Energy. Geology, geotechnical and ground engineering. Health and safety. Law and contracts. Leadership and management.
Ask for price
Lot 1-Bills of Quantity(Excel)
Lot 1:Bill2-Bill of Quantities for Construction of Antenatal Clinic and M & E Offices at Aweil A MAIN SUMMARY A.1 Bill No.1- Preliminaries 1 Item A.2 Item Description Qty Unit Bill No.2- Construction of Antental Clinic 1 Item A.3 Bill No.3- Construction of M & E Offices 1 Item Total Main Summary Contingency 5% GRAND TOTAL
Ask for price
BILL NO. 1 PRELIMINARIES Polokwane
quantities must take account of and include for all of the obligations, requirements and specifications given in the said Model Preambles and in any supplementary preambles PRICING OF PRELIMINARIES Should the contractor select Option A in terms of subclause 3.2.1 in the Contract Data Contractor to E m p l o y e r (CE) for
Ask for price
Bill of Quantity (BOQ) FOR Routine Maintenance Work
office of the director (maint) m-4 & m-4 (ext) summary of bill of quantities routine maintenance work (km 00 to km 52) bill no.6 ancillary works rmf-305-2017-18 code description unit rate (rs.) quantity amount (rs) 601ai rcc new jersy barrier (in-situ) for median double face (incl. reinforcement) m 11060.42 -601di
Ask for price
ATTCHMENT 3 BILL OF QUANTITIES
BILL OF QUANTITIES . m 210.00 39 Door angle bar 50x50x5mm m 6.50 40 Hinge pair 1.00 41 Valve unit 1.00 42 Metal lath with 40x40mm mesh m 2 452.00 43 Armature t 0.10 44 Oil pointing of columns (2 coats) m 2 44.000 2. Pipeline (Aqueduct) 1 Excavation of Class III grounds, side-dumping of the soil m
Ask for price
BILL OF QUANTITIES Kisumu
Bill No. 5 Earthworks 5.1Cut to spoil in soft. m3 3,540 5.2Cut to spoil in hard. m3 44 5.3Compact the surface in to receive approved fill or pavement material to the satisfaction of the Engineer. m2 17,680 5.4Provide, lay and compact approved fill material to formation levels in 150mm layers compacted to 100%MDD (AASHTO T99) as subgrade. m3 450
Ask for price
Bill of Quantities (BoQ) Revised Version
Bill of Quantities (BoQ) Revised Version Rehabilitation of Agricultural Wells in the Jordan Valley A. Unit prices of all items shall include but not limited to cleaning the site from all surplus, backfill material, or result of excavation, repairing all damages
Ask for price
Billing of Quantities (BOQ) Types Example BOQ
Jul 04, 2019· Bill of Quantities also referred to as BOQ, is a document formulated in the construction industry to specify materials, labors, and their cost. It serves as a communication tool between client, consultant & the contractor. It is usually prepared by a cost consultant or a surveyor. Primarily there are two types of BOQs
Ask for price
BILLS OF QUANTITIES
Shall be as specified in the Bills of Quantities or equal and approved. Prices must include for removing and refixing during and after painting, for labelling all keys, and for fixing with matching screws. METALWORK Structural Steelwork shall comply with M.O.W. "Structural Steelwork Specification" 1973.
Ask for price
BILLS OF QUANTITIES IUCN
As page 1/13 of the Bills of Quantities will be KShs. 50,000.00 per calendar week or part thereof. In the event of us being awarded the above works, we propose to use the following subcontractors, subject to the Architect’s approval.
Ask for price
BILL OF QUANTITIES FOR THE PROPOSED RENOVATION
33.00 m 7 Supply and Install 200x22mm softwood timber Fascia Board 135.00 m SAFETY & SECURITY Timber to roof trusses 1 150 x 50mm 135.00 m 2 100 x 50 mm 75.00 m 3 50 x 50mm 140.00 m IBR Roofing 4 Supply and fit 0.5mm IBR roofing sheets m115.00 2 5 Supply and fit G.I Ridges 10.00 m 6
Ask for price
Example Bill of Quantities CESMM4 Revised: Examples
Aug 10, 2020· All Subjects. Buildings and structures. Coastal and offshore engineering. Development, planning and urban engineering. Energy. Geology, geotechnical and ground engineering. Health and safety. Law and contracts. Leadership and management.
Ask for price
Bill of Quantities and Cost Estimates
Feasibility Report Madian Hydropower Project 7166P02/Vol. II, BoQ and Cost Estimates List of Annexes: Annex A-9.1: Quotation of Material Unit Prices of Manufacturers /Suppliers Annex A-9.2: Cost of Construction Equipment Monthly Rental Annex A-9.3: Comparative Statement of Unit Rates of 6 Hydropower Projects Annex A-9.4: Bill of Quantities of Madian Hydropower Project
Ask for price
BILL NO. 1 PRELIMINARIES Polokwane
quantities must take account of and include for all of the obligations, requirements and specifications given in the said Model Preambles and in any supplementary preambles PRICING OF PRELIMINARIES Should the contractor select Option A in terms of subclause 3.2.1 in the Contract Data Contractor to E m p l o y e r (CE) for
Ask for price
Lot 1-Bills of Quantity(Excel)
Lot 1:Bill2-Bill of Quantities for Construction of Antenatal Clinic and M & E Offices at Aweil A MAIN SUMMARY A.1 Bill No.1- Preliminaries 1 Item A.2 Item Description Qty Unit Bill No.2- Construction of Antental Clinic 1 Item A.3 Bill No.3- Construction of M & E Offices 1 Item Total Main Summary Contingency 5% GRAND TOTAL
Ask for price
Bill of Quantities Kericho Tenders
ruts and reshape the surface to specified camber M 2 28,000.00 10.03 Provide, process and compact to 120mm thick compacted gravell wearing course accross full width of the carriageway as directed by the Engineer to 95% MDD (AASHTO T99) CM 2,592.00 Total Carried Forward to Summary: Bill of Quantities Bill No. 5: Grading and Gravelling
Ask for price